~
Technical parameters:
Model: DYJ-1018
Ultrasonic frequency: 1.7MHz
Ultrasonic power: 1800W
Power supply voltage: AC220V + 10% 50Hz
Electric heating power: no
Product size (mm):700 x 360 x 410
Humidifying capacity: 18000ml/h
Application area: 160-180 square meters
Automatic temperature control: no
Automatic wet:
Automatic water-supply control:
Housing material: stainless steel paint
Working temperature: 10 C < the temperature of <40 DEG C
The scope of application
Textile industry: humidity control textile factory, to eliminate static electricity and dust.
Paper industry: control paper moisture, to eliminate static electricity and dust.
Computer room: humidity control and eliminate static electricity of various types of computer room.
Electronic industry: humidity control semiconductor components factory, LCD factory, PCB factory, IC test plant and to eliminate static electricity.
Coating industry: humidity control automobile coating factory, all kinds of spraying plant, to eliminate static electricity and dust.
Plastics industry: plastic products plastic injection molding factory, factory humidity control and eliminate static electricity.
Printing industry: plastic printing, printing, special printing humidity control and eliminate static electricity.
Laboratory: various types of inspection, testing, quality, analysis, laboratory environment humidity.
The tobacco industry: tobacco processing, production of humidity control and dust.
HVAC: central air-conditioning humidifying, computer room central air conditioner humidifying and eliminate static electricity.
Storage: fruit and vegetable products and humidity preservation, storage.
The food industry: dry, dehydrated food, fresh moisture regain.
Planting: planting scale fungus, flowers, tropical plants and soilless cultivation of humidity control.
Aquaculture industry: livestock, birds, insects and other large-scale farming moisturizing and disinfection.
Artificial landscape: tropical artificial rainforest, film and television, exhibitions and mimic the natural environment mist landscape.
Note:
1 atomization quantity size and power supply voltage, supply current, temperature, water quality, water level and flow of air condition about. The fog size is the test data of our standard test environment based on the.
2 level refers to the surface of the shell to the vertical distance from the surface of the water.
3 atomizer operating current will be with the working voltage increased slightly increased with temperature increased slightly reduced.
4 water quality will affect the ability to identify water shortage protection switch, recommend the use of clean tap water.
5 usually clean tap water conductivity is 120-250 US/CM, the conductivity of pure water is 5-15US/CM, the size is determined by the specific conductivity of the water quality situation of the local.
Product maintenance and maintenance:
In order to your product to achieve the long service life and the best results, please read the following carefully.
* atomizer by after long time working the casing and the atomization sheet surface will be deposited with the scale, seriously affecting their life and atomization quantity, it is suggested that at least once every half a month cleaning a atomizer. A soft clean cloth dipped in alcohol available when gently scrub the atomizer casing and atomizing sheet surface, do not use a hard object cleaning atomizing piece, so as to avoid scratching the atomizer plate.
"Water quality will affect the service life of the atomizer, recommend the use of clean water.
"When the atomizer after long time work (about 3000 hours), atomizing piece life will decay, atomization quantity decreases, you can replace the atomizing piece new, atomizing sheet and supporting tool spoon please contact your local dealer or the company purchase. Replace the reference method (Figure 1) to replace the steps are as follows:
The power supply is cut off, remove the atomizer from the water, and soon to be upside down, inside the atomizer water flow out of all, and then use dry cloth to wipe the spray chamber and the inner surface of the water atomizer.
The tool spoon unscrew the pressure ring, remove the piece in the old, and keep the atomization transducer sheet cavity dry, clean.
The new change can piece positive upward, downward installed and tightened negative pressure ring.